The gravel roads threading through the Tlicho region will see heavy equipment moving under a new financial arrangement by nightfall. The Government of Canada’s First and Last Mile Fund is backing a joint venture between Fortune Minerals and the Tlicho government. The money targets a stubborn problem: how to get ore from a remote northern mine to a highway, rail line, or port.
That last stretch of road is brutally expensive. Hard to finance.
The fund is meant to change that. Fortune Minerals has spent years on the NICO cobalt-gold-bismuth project northwest of Yellowknife. The Tlicho government sits at the center of that proposed development.
They are not a passive royalty collector here. The joint venture makes them a co-owner of the infrastructure that will carry concentrate out of the territory.
Up to $50 million is on the table. The money flows from a federal program designed to solve the gap between a mine site and the nearest transportation link. For the Tlicho, that could mean a road serving both the mine and their communities.
Ore moves one way. Supplies, groceries, and fuel move the other. Residents describe the fund as a long-overdue recognition that northern roads are economic arteries.
The stakes are concrete. Without that road, the NICO project stalls.
Without the project, the road may never get built. The joint venture ties them together. The Tlicho government has made clear that any development must meet their standards for environmental protection and community benefit.
That is not a throwaway line. It is a condition.
The scene in the region is one of cautious optimism, not blind enthusiasm. This is not a small deal. The First and Last Mile Fund is specifically aimed at projects that connect natural resource sites to existing networks.
The NICO project is exactly the kind of remote operation the fund was created for. Cobalt is a critical mineral, used in batteries and electronics. Gold and bismuth have their own markets.
But none of it moves without a road. The joint venture structure matters.
The Tlicho are not just signing a memorandum of understanding. They are co-owners. That means a share of the risk and a share of the reward.
It means a voice in how the infrastructure is built and operated. On the ground, the heavy equipment is already moving.
That is a concrete detail. The gravel roads are being used. The work will have a new backer by nightfall.
The money is not hypothetical. It is arriving. The fund is a federal program.
That means taxpayer dollars are being directed into this venture. The government is betting that connecting the NICO site to transportation networks will generate economic activity that justifies the investment.
The Tlicho are betting that the road will serve their communities long after the mine is gone. Both bets depend on the same thing: that the road gets built and stays built. That is the stake.
A road that moves ore out and supplies in. A road that ties resource extraction directly to Indigenous economic development.
A road that is owned jointly, not imposed from outside. The cautious optimism in the region reflects that. People have seen promises before.
They have seen projects stall. They have seen roads that go nowhere. This one has money behind it and a structure that gives the Tlicho a real seat at the table.
That is different. But it is not guaranteed.





