Earthquakes, volcanoes, storms, energy, mining and space

Home » SpaceX, ULA, Blue Origin, Relativity Space vie for $30B Space Force launches

Space Force Triples Launch Contract Ceiling to $17 Billion, Pushing NSSL Past $30 Billion

By

–

Spacex Falcon 9 Launch

The Space Force tripled the ceiling on its Lane 1 launch contract to $17 billion on Friday, July 18. Added to the $13.7 billion ceiling on Lane 2, the National Security Space Launch Phase 3 program can now spend more than $30 billion.

The old Lane 1 limit was $5.6 billion, sized for an estimated 30 missions over five years. The Space Force has not said how many missions it now expects to buy. Demand, though, has clearly run ahead of the plan.

Two lanes, different rules

Under NSSL, Space Systems Command does not pick rockets in advance. It asks a pre-qualified pool of providers to bid on individual missions, split across two lanes.

Lane 2 covers the top-priority work: the government’s largest intelligence satellites and radiation-hardened communications satellites built to survive nuclear electromagnetic pulses. Only certified rockets can fly it, and right now that means SpaceX’s Falcon 9 and Falcon Heavy and United Launch Alliance’s Vulcan. When the Lane 2 ceiling was set last year, it was meant to cover about 54 launches through 2029. By April 2026, Space Systems Command had found 25 more missions, an increase of roughly 46 percent in under a year.

Lane 1 handles medium-lift missions, experimental payloads and rideshare flights for surveillance and data-relay constellations. Certification is lighter, so the field is wider. SpaceX, ULA and Blue Origin were chosen when Phase 3 began in 2024. Rocket Lab USA, Stoke Space, Relativity Space and Impulse Space have since joined the pool.

Who is winning

SpaceX has taken the largest share of Lane 1 task orders so far. Blue Origin landed its first this year. The others are qualified to bid but have not yet piled up meaningful volume.

Orbital Intel, which reported the ceiling change, names three drivers. The Space Force has given SpaceX multibillion-dollar contracts to deploy satellites for the Space Data Network, which is meant to connect US forces worldwide, and for the Airborne Moving Target Indicator program, which is meant to deliver targeting data from orbit. The third is the Trump administration’s Golden Dome missile defense plan, expected to put space-based warning sensors and interceptors in orbit. The size of that constellation has not been made public.

Money is moving the same direction. The administration asked for $71.1 billion for the Space Force in fiscal 2027, against about $40 billion in fiscal 2026. The House Appropriations Committee’s draft Pentagon bill carries $55.5 billion. The Senate has not released its version.

A ceiling is not a payout

The $30 billion is the most the government may spend. It is not money promised to anyone. Orders go out one mission at a time, and Orbital Intel argues that SpaceX’s mature, high-flight-rate Falcon 9 makes it the default winner unless a mission needs something else.

Smaller entrants have it harder. Stoke is developing a fully reusable two-stage rocket, and Relativity has moved on from its 3D-printed Terran 1 to a larger vehicle. Neither has shown the launch cadence needed to turn a Lane 1 slot into steady revenue. Blue Origin’s single win is, in the outlet’s words, not enough to establish a pattern. ULA’s pitch rests on offering the government a second certified Lane 2 provider.

Sources

Get breaking stories first on our Telegram channel.

More stories by

Most read

Natural Disasters

Energy & Mining

Space

Science Discoveries